SE RENEWABLE POWER GENERATION
Financed · Slovakia
Source: European Investment Bank (EIB)
The project concerns an investment programme comprising multiple schemes relating to the refurbishment and upgrading of existing hydro power stations (22 in total ranging in capacity from around 1MW to around 700MW) and the construction of 6 new small run of river hydropower units, ranging in capacity from 0.25 to 3.4MW. The project schemes will be dispersed throughout the Slovak Republic.
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Government
- Location
- Slovakia
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about SE RENEWABLE POWER GENERATION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | financed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project concerns an investment programme comprising multiple schemes relating to the refurbishment and upgrading of existing hydro power stations (22 in total ranging in capacity from around 1MW to around 700MW) and the construction of 6 new small run of river hydropower units, ranging in capacity from 0.25 to 3.4MW. The project schemes will be dispersed throughout the Slovak Republic. |
Original sector | Energy |
Budget |
Location
Country | Slovakia |
Source
Source reliability | High |
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government |
Article published date | 2023-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Slovakia
- Devinsky Lom pumped storage plant
- Innovative methods for monitoring and inventory of Danube floodplain forests based on 3D technologies of remote sensing
- Joint activities for the prevention of natural disasters in the transboundary Uzh river basin
- Revitalization of Eutrophic Waters for Different Degrees of Pollution and the Size of Water Areas
- Improved access to the TEN-T network through upgrading roads in the areas of Podhale and Tvrdošín District
- Wolfsthal-Bratislava hydropower project
- Improvement of the Ecological Stability of the Border Area of Horňácka and Kopanice through Environmental Management and Building of Ecostabilizing Elements in the Landscape
- Complex solution for Danube stretch downstream of Bratislava (Water Structure Gabčíkovo–Nagymaros)
