SE Rochester Road Project
Sector: Road • Location: Rochester, Minnesota, United States
Source: KROC-AM
The SE Rochester Road Project involves concrete rehabilitation work on County Road 1 (11th Avenue SE) between Highway 14 and Highway 52, including bituminous shoulder mill and overlay, and restriping. The project aims to improve the roadway while maintaining traffic flow with reduced lanes.
- Status
- Under Construction
- Sector
- Road, Cement, Manufacturing (Industrial)
- Location
- Rochester, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- KROC-AM
ConstructChat
Ask ConstructChat about SE Rochester Road Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The SE Rochester Road Project involves concrete rehabilitation work on County Road 1 (11th Avenue SE) between Highway 14 and Highway 52, including bituminous shoulder mill and overlay, and restriping. The project aims to improve the roadway while maintaining traffic flow with reduced lanes. |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Rochester |
Source
Source | KROC-AM |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Manufacturing (Industrial) |
Article published date | 2025-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
