SE THERMAL POWER STATION_REFURBISHMENT
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
Rehabilitation of Vojany I coal-fired power station
- Status
- Closed
- Sector
- Geothermal, Power Generation (CCGT), Government
- Location
- Slovakia
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about SE THERMAL POWER STATION REFURBISHMENT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | fully reimbursed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rehabilitation of Vojany I coal-fired power station |
Original sector | Energy |
Location
Country | Slovakia |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in Slovakia
- Use of geothermal resources in Michalovce
- Biogáz Üzem Tervdokumentációjának Elkészítése
- KOMBI - Cross-border integrated bike sharing system
- Geothermal Wells Drilling in Slovakia
- Shelter / Grau Architects
- Slovakia's First Pumped Thermal Energy Storage (PTES) Facility
- Connecting energy performance contracts with public subsidy programmes
- Europe's First Grid-Scale Pumped Thermal Energy Storage System
