logo
ProjectClosed

SEA Baggage Optimization Phase 3

Sector: Manufacturing (Industrial) • Location: Seatac, Washington, United States of America

Source: Dodge USA

Phase 3 concludes the Baggage Optimization Program (BOP) allowing for complete baggage flexibility to check in any bag into any ticket counter and be delivered to any airplane. It also accommodates for passenger volume growth and meets TSA safety mandates. This phase will tie-in all the south end systems to centralized screening, including the International Arrivals Facility (IAF), and finalize th

Status
Closed
Sector
Manufacturing (Industrial), Commercial, Government, Airport
Location
Seatac, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about SEA Baggage Optimization Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SEA Baggage Optimization Phase 3” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Seatac, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 3 concludes the Baggage Optimization Program (BOP) allowing for complete baggage flexibility to check in any bag into any ticket counter and be delivered to any airplane. It also accommodates for passenger volume growth and meets TSA safety mandates. This phase will tie-in all the south end systems to centralized screening, including the International Arrivals Facility (IAF), and finalize the sortation and ticket counter connections. The estimated Maximum Allowable Construction Cost (MA...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Seatac

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Government, Airport

Article published date

2025-01-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project