SEA Baggage Optimization Phase 3
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
Phase 3 concludes the Baggage Optimization Program (BOP) allowing for complete baggage flexibility to check in any bag into any ticket counter and be delivered to any airplane. It also accommodates for passenger volume growth and meets TSA safety mandates. This phase will tie-in all the south end systems to centralized screening, including the International Arrivals Facility (IAF), and finalize th
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Airport, Government
- Location
- Seatac, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SEA Baggage Optimization Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 3 concludes the Baggage Optimization Program (BOP) allowing for complete baggage flexibility to check in any bag into any ticket counter and be delivered to any airplane. It also accommodates for passenger volume growth and meets TSA safety mandates. This phase will tie-in all the south end systems to centralized screening, including the International Arrivals Facility (IAF), and finalize the sortation and ticket counter connection-scope of work currently bidding: SC/CM Mechanical Insta... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seatac |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Airport, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
