Sea-to-Sky Highway Improvement Project British Columbia, Canada

Sector: Automotive • Location: Canada

Source: Road Traffic Technology

Project
Closed

The Sea-to-Sky Highway Improvement project is due to be ready in time for the 2010 Winter Olympics. The S2S covers 100km from Whistler to West Vancouver. The mechanically stabilised earth walls in the S2S Improvement Project use a steel reinforcing mesh. Some parts of the Sea-to-Sky Highway are being widened to four lanes, using new, stronger bridges to withstand adverse weather conditions. The Pr

Project Information FAQ

Project Information

5 Q
The project “Sea-to-Sky Highway Improvement Project British Columbia, Canada” is an infrastructure initiative in the Automotive sector, located in Canada. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Sea-to-Sky Highway Improvement project is due to be ready in time for the 2010 Winter Olympics. The S2S covers 100km from Whistler to West Vancouver. The mechanically stabilised earth walls in the S2S Improvement Project use a steel reinforcing mesh. Some parts of the Sea-to-Sky Highway are being widened to four lanes, using new, stronger bridges to withstand adverse weather conditions. The Province of British Columbia has invested $200m into the Sea-to-Sky Highway project. The Sea-to-Sky Highway in British Columbia, Canada, forms part of Highway 99 and runs from West Vancouver to Whistler. The ministry of transportation of British Columbia began an improvement project (the Sea-to-Sky Highway Improvement Project) on the road in 2005. The goal of the $600m project was to upgrade the road to improve safety and capacity for the future. The improved highway is capable of meeting population growth and travel demands until 2030. The improvements were completed in December 2009, before the Winter Olympic Games that were hosted in February 2010. The games were hosted in Vancouver and Whistler and so there was a need for excellent road access. Before the improvement project was started, the road was a winding two-lane highway with poor access and many blind spots. A new highway from Eagleridge to the North Junction, which is towards north of Horseshoe Bay was open to traffic in April 2009. This four lane highway enhances the capacity and safety of the old highway. The highway provides the commuters, spectacular views of some of British Columbia’s most stunning scenery. Contractors The contract for the road improvement was awarded in part in 2004 by the Province of British Columbia (Ministry of Transportation) and also the BC Transportation Financing Authority, on a design-build-finance-operate basis to S2S Transportation Group. The S2S consortium includes Macquarie Group (project manager), Peter Kiewit Sons Co (design-builder), Hatch Mott MacDonald (HMM) (engineers and design), JJM Construction, ND Lea, McElhanney Engineering Services Ltd, Miller Paving and Capilano Highway Services. The project was one of the first public private partnerships (PPP) to be started in North America. The PPP project was one with a difference, in that it involved both private and public segments. The S2S Transportation Group had a $400m capital component in its contract to design, build, finance and operate a highway via a 25-year performance-based contract. In addition, the Province of British Columbia has itself invested $200m into another section of the project. The S2S project included: The government-upgraded sections have included: CH2M Hill was involved in the design of the Department of Transportation road sections. Project This road project involved upgrading 95km of the Sea-to-Sky Highway (Highway 99) between Vancouver and Whistler in British Columbia. Project construction work included 48 new bridges and interchanges, 219 mechanically stabilised earth (MSE) retaining walls, 2.4 million cubic metres of earthwork and 450,000t of asphalt paving. The project was managed in four distinct geographical sections so that the project could proceed efficiently between the two groups of contractors. These were Whistler to Squamish via Cullinton Creek, Squamish to Murrin Park, Murrin Park to Lions Bay and Lions Bay to West Vancouver. The highway improvements have resulted in provision of better sight lines, additional lanes and widened paved shoulders to accommodate cyclists and emergency pull-offs. In addition, highly reflective pavement markings (HRPM) were installed. The HRPMs are five times more reflective when compared to traditional highway paint and provide more visibility on dark, rainy nights. The constructed chain-up areas can be used by motorists to pull off and install traction devices when required. The slope management plans implemented reduce falling rock from reaching the highway. The rocks on the highway will be regularly inspected and scaled under the annual maintenance programme. Benefits of the project The Sea-to-Sky Highway Project was aimed to give straighter roads with better sight lines (not so many blind bends) in order to provide more consistent driving speed. There are also 80km of new passing lanes between Horseshoe Bay and Whistler and new reflective markings along the entire route for better visibility. Where possible on the route, it is provided with median barriers for safety and intersections are made safer. There are rumble strips on centre lines. In addition, there are stronger bridges constructed to withstand adverse weather and debris washed down by storm water. Shoulders are widened for cyclists and disabled vehicles. The whole road is monitored using electronic weather equipment so that highway maintenance can act quickly in case of ice and snow. The route has been provided with better facilities such as pull-ins and shelters for the highway patrol along the route.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data