Seaboard Station Utility Improvements
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge
The Project consists generally of the following major items: Furnish and install approximately 850 LF of 8 through 15 SDR 26 PVC Sanitary Sewer to be installed by open cut Furnish and install approximately 120 LF of 16 DR-18 C900 Sanitary Sewer to be installed by open cut within CSX R/W Furnish and install approximately 370 LF 36 steel encasement pipe with 16 DR- 18 C900 RJ PVC Sanitary Sewer to b
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Transmission, Government, Steel, Power Generation (CCGT), Metal
- Location
- Raleigh, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Seaboard Station Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists generally of the following major items: Furnish and install approximately 850 LF of 8 through 15 SDR 26 PVC Sanitary Sewer to be installed by open cut Furnish and install approximately 120 LF of 16 DR-18 C900 Sanitary Sewer to be installed by open cut within CSX R/W Furnish and install approximately 370 LF 36 steel encasement pipe with 16 DR- 18 C900 RJ PVC Sanitary Sewer to be installed by Bore and Jack within CSX R/W Furnish and install approximately 30 LF of 8 RJ PC 35... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Raleigh |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Transmission, Government, Steel, Power Generation (CCGT), Metal |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
