logo

Seabrook - Hampton 15904

Sector: Automotive • Location: Hampton, New Hampshire, United States of America (USA)

Source: New Hampshire Department of Transportation (NHDOT)

Project
Design

The project entails the rehabilitation or replacement of the Neil R Underwood Bridge (NHDOT Bridge No. 235/025) which spans the Hampton River at the inlet to Hampton Harbor. The bridge is a vital transportation link between the Village of Hampton Beach and Seabrook Village. The bascule bridge was built in 1949 and replaced a wooden bridge originally constructed for trollies and cars, known as the

Project Information FAQ

Project Information

4 Q
The project “Seabrook - Hampton 15904” is an infrastructure initiative in the Automotive sector, located in Hampton, New Hampshire, United States of America (USA). Taiyo aggregates data on it from New Hampshire Department of Transportation (NHDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the rehabilitation or replacement of the Neil R Underwood Bridge (NHDOT Bridge No. 235/025) which spans the Hampton River at the inlet to Hampton Harbor. The bridge is a vital transportation link between the Village of Hampton Beach and Seabrook Village. The bascule bridge was built in 1949 and replaced a wooden bridge originally constructed for trollies and cars, known as the “Mile-Long Bridge”. It has been rehabilitated multiple times, including in 1963, 1978, 1983, 1990, 2002 and 2010. Emergency repairs to the bascule span mechanical system were undertaken in 2018. A Bridge, Type, Size and Location Study (TS&L) will be conducted by NHDOT. This study will evaluate three alternatives, Major Rehabilitation, Replacement with a Bascule, and Replacement with a Fixed Structure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data