logo

Sealand Solar and Battery Project

Sector: Energy Storage • Location: Flintshire, Wales, United Kingdom

Source: Leader Live

Project
Planned

Renewable Connections has proposed a solar farm of up to 89MW and a battery energy storage system (BESS) of up to 40MW at Sealand, Flintshire. The project aims to supply power for approximately 33,575 homes and reduce CO2 emissions significantly.

Status
Prospective
Sector
Energy Storage, Power Generation (CCGT), Raw Materials, Solar
Location
Flintshire, Wales, United Kingdom
Updated
22 Jul 2026
Source
Leader Live

ConstructChat

Ask ConstructChat about Sealand Solar and Battery Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Sealand Solar and Battery Project” is an infrastructure initiative in the Energy Storage sector, located in Flintshire, Wales, United Kingdom. Taiyo aggregates data on it from Leader Live.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Renewable Connections has proposed a solar farm of up to 89MW and a battery energy storage system (BESS) of up to 40MW at Sealand, Flintshire. The project aims to supply power for approximately 33,575 homes and reduce CO2 emissions significantly.

Original sector

Energy

Location

Country

United Kingdom (UK)

State

Wales

City

Flintshire

Source

Source

Leader Live

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Raw Materials, Solar

Article published date

2025-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project