Seaside Battery Energy Storage System Project
The owner, status and timeline of this project. A free account opens every field.
Source: TradingView
The Seaside Battery Energy Storage System Project was placed in service on July 8, 2025, adding $395 million to the Electric utility plant, net. This project enhances the electric utility infrastructure by providing battery energy storage capabilities.
- Status
- Closed
- Sector
- Energy Storage, Power Transmission, Power Generation (CCGT)
- Location
- Seaside, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- TradingView
ConstructChat
Ask ConstructChat about Seaside Battery Energy Storage System Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Seaside Battery Energy Storage System Project was placed in service on July 8, 2025, adding $395 million to the Electric utility plant, net. This project enhances the electric utility infrastructure by providing battery energy storage capabilities. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Seaside |
Source
Source | TradingView |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
