logo

Seattle Pier 15.5 Coatings REBID

Sector: Manufacturing (Industrial) • Location: Seattle, Washington, United States of America

Source: Dodge

Project
Closed

Seattle Pier 15.5 Coatings .This includes, but is not limited to, removal of existing coatings and a reapplication of the specified coating. Work windows shall be required around Alaska Marine Lines (AML) Seattle barge schedules. It is anticipated 2-3 weekly with approximately 2 or 5 day windows on alternating weeks. The barge slip shall remain operational for barge operations.

Status
Closed
Sector
Manufacturing (Industrial), Commercial
Location
Seattle, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Seattle Pier 15.5 Coatings REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Seattle Pier 15.5 Coatings REBID” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Seattle, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Seattle Pier 15.5 Coatings .This includes, but is not limited to, removal of existing coatings and a reapplication of the specified coating. Work windows shall be required around Alaska Marine Lines (AML) Seattle barge schedules. It is anticipated 2-3 weekly with approximately 2 or 5 day windows on alternating weeks. The barge slip shall remain operational for barge operations.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Seattle

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project