Seattle Public Library Central L2 Remodel
Sector: Power Generation (CCGT) • Location: Seattle, Washington, United States of America
Source: Dodge
The Project renovates interior space on Level 2 of the Central Branch to office and mixed-use work spaces to support the shelving and operations team SHO. On Levels 1 and 3, the work will refinish and renovate the existing reception desks in addition to build-out of an enclosed book drop room on Level t to replace the defunct book conveyor system. Scope includes, but is not Limited to: modificatio
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial, Education, Residential, Government
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Seattle Public Library Central L2 Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project renovates interior space on Level 2 of the Central Branch to office and mixed-use work spaces to support the shelving and operations team SHO. On Levels 1 and 3, the work will refinish and renovate the existing reception desks in addition to build-out of an enclosed book drop room on Level t to replace the defunct book conveyor system. Scope includes, but is not Limited to: modification of existing electrical, mechanical, fire alarm and fire sprinkler systems; construction of new ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial, Education, Residential, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
