SEBOU II DEVELOPMENT
Sector: Mass Transit • Location: Morocco
Source: World Bank Group
The Second Sebou Irrigation Project for Morocco consists of: (a) construction of earth flood protection dikes and ancillary works to protect the 35,200 ha being developed for irrigated agriculture under the Rharb-Sebou Irrigation Project and to confine flood overspill from the Sebou river to three flood escape channels; resettlement of families now living in the channels; (b) strengthening of road
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Second Sebou Irrigation Project for Morocco consists of: (a) construction of earth flood protection dikes and ancillary works to protect the 35,200 ha being developed for irrigated agriculture under the Rharb-Sebou Irrigation Project and to confine flood overspill from the Sebou river to three flood escape channels; resettlement of families now living in the channels; (b) strengthening of roads and railway tracks in the flood escape channels to prevent during floods; (c) surveys, design and supervision of construction of the flood protection works; (d) the construction of a sugarcane factory at Mechra bel Ksiri; (e) a study of existing industrial pollution of the lower Sebou river and, if justified by such study, construction of an effluent treatment plant to prevent pollution of the Sebou river; (f) improvements to about 100 km of primary and secondary roads, bituminous surfacing of about 100 km of tertiary and unclassified access roads and construction of a new bridge over the Sebou river at Mechra Bel Ksiri; (g) improvement of about 230 km of tertiary and unclassified access roads; (h) procurement of equipment for road maintenance; (i) a study of Bilharzia infestation in the Rharb plain and the possibility for its eradication; and (j) training. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
