SEC Potable Water Distribution System Improvements
Sector: Water Supply and Storage • Location: Orlando, Florida, United States of America
Source: Dodge
The purpose of this Work is to replace a portion of the Potable Water distribution piping system at Orlando Utilities Commission s (OUC) Stanton Energy Center (SEC). OUC produces Potable Water on site at SEC and distributes it throughout the site using a network of Polyethylene (PE) piping. The Work consists of furnishing all labor, equipment, and materials for the replacement of the piping, inclu
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The purpose of this Work is to replace a portion of the Potable Water distribution piping system at Orlando Utilities Commission s (OUC) Stanton Energy Center (SEC). OUC produces Potable Water on site at SEC and distributes it throughout the site using a network of Polyethylene (PE) piping. The Work consists of furnishing all labor, equipment, and materials for the replacement of the piping, including, but not limited to the following: a. Installation of PE pipe in the size and quantities des... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
