SECI 200 MW Solar Project BoS Package
Sector: Power Generation (CCGT) • Location: Dhar, Madhya Pradesh, India
Source: Mercomindia.com
Amar Infrastructure won the auction to supply the balance of system (BoS) package for a 200 MW solar project in Dhar, Madhya Pradesh. The scope includes design, engineering, procurement, supply of equipment and materials (except solar modules), erection, testing, commissioning, and five years of operation and maintenance. The project is part of the 12 GW solar power projects under the Central Publ
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar
- Location
- Dhar, Madhya Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about SECI 200 MW Solar Project BoS Package
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Amar Infrastructure won the auction to supply the balance of system (BoS) package for a 200 MW solar project in Dhar, Madhya Pradesh. The scope includes design, engineering, procurement, supply of equipment and materials (except solar modules), erection, testing, commissioning, and five years of operation and maintenance. The project is part of the 12 GW solar power projects under the Central Public Sector Undertaking Phase II program. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Madhya Pradesh |
City | Dhar |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar |
Article published date | 2025-11-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
