logo

SECI 260 MWp Solar Module Supply Project

Sector: Manufacturing (Industrial) • Location: Dhar, Madhya Pradesh, India

Source: Mercomindia.com

Project
Awarded

FS India Solar, a subsidiary of First Solar, won the auction to supply domestically manufactured 260 MWp solar modules for a project in Dhar, Madhya Pradesh. The project involves manufacturing, testing, packaging, shipping, supplying, and transporting solar modules with a 25-year warranty and a 12-month defect liability period. Modules must use domestically manufactured solar cells and comply with

Status
Closed
Sector
Manufacturing (Industrial), Power Generation (CCGT), Solar
Location
Dhar, Madhya Pradesh, India
Updated
22 Jul 2026
Source
Mercomindia.com

ConstructChat

Ask ConstructChat about SECI 260 MWp Solar Module Supply Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SECI 260 MWp Solar Module Supply Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Dhar, Madhya Pradesh, India. Taiyo aggregates data on it from Mercomindia.com.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

FS India Solar, a subsidiary of First Solar, won the auction to supply domestically manufactured 260 MWp solar modules for a project in Dhar, Madhya Pradesh. The project involves manufacturing, testing, packaging, shipping, supplying, and transporting solar modules with a 25-year warranty and a 12-month defect liability period. Modules must use domestically manufactured solar cells and comply with the Approved List of Models and Manufacturers (ALMM).

Original sector

Energy

Budget

Location

Country

India

State

Madhya Pradesh

City

Dhar

Source

Source

Mercomindia.com

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Power Generation (CCGT), Solar

Article published date

2025-11-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project