Secker Drive Water Line Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This proposed project would replace approximately 200 feet of corroded 2" galvanized steel pipelines, located in an unnamed street off Box Canyon Road across from Secker Drive, the existing pipeline has been repaired several times by Waterworks District staff in response to emergency failures. By installing the new pipeline, water service reliability would improve existing properties. The plan is
- Status
- Prospective
- Sector
- Steel, Road, Water Supply and Storage, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Simi Valley, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Secker Drive Water Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This proposed project would replace approximately 200 feet of corroded 2" galvanized steel pipelines, located in an unnamed street off Box Canyon Road across from Secker Drive, the existing pipeline has been repaired several times by Waterworks District staff in response to emergency failures. By installing the new pipeline, water service reliability would improve existing properties. The plan is to complete the design by November 2028 and complete construction by April 2029. The City of Simi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Simi Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Road, Water Supply and Storage, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
