Second Adityapur Toll Bridge over River Kharkali

Sector: Road • Location: India

Source: World Bank Group

Project
Active

In October 2007, the Government of Jharkhand (GoJ) signed a 30 year concession contract (including two and a half years of construction period) to India’s IL&FS Infrastructure Development Corporation (IIDC) to widen and strengthen the 270m long four lane bridge across river Kharkai along with 2 km of total approach road on both sides with a toll plaza on Adityapur in the state of Jharkhand.

Und

Project Information FAQ

Project Information

4 Q
The project “Second Adityapur Toll Bridge over River Kharkali” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In October 2007, the Government of Jharkhand (GoJ) signed a 30 year concession contract (including two and a half years of construction period) to India’s IL&FS Infrastructure Development Corporation (IIDC) to widen and strengthen the 270m long four lane bridge across river Kharkai along with 2 km of total approach road on both sides with a toll plaza on Adityapur in the state of Jharkhand. Under the contract, IIDC was responsible for the design, construction, finance, operation and maintenance of the bridge cum road stretch. The upgradation project was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. IIDC established Adityapur Toll Bridge Company Ltd, a special purpose vehicle, to implement the project. IIDC won the tender through competitive bidding, conducted by Government of Jharkhand (GoJ) by bidding for lowest fixed subsidy of US$ 2 million. Apart from this upfront payment by GoJ, under the contract, the company was allowed to recover the capital costs and operating costs including returns through tolling during the concession period (excluding construction period). The project reached financial closure in November 2007. The total capital cost of the project was estimated at US$ 13.75 million. Construction on the project began in November 2007 and is expected to be completed by May 2010. www.projectstoday.com

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data