Second Bridge across River Godavari at Sarapaka
Sector: Bridge • Location: Kothagudem, Telangana, India
Source: Telangana Today
The second bridge across river Godavari near Sarapaka in Kothagudem district was commissioned in April 2024. The approach road on the right side of the bridge caved in within two years, disrupting traffic between Sarapaka and Bhadrachalam. Repair works and investigations into the cause of the collapse have begun. The bridge was built by Rajdeep Buildcon Private Limited at an estimated cost of Rs 9
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under repair |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The second bridge across river Godavari near Sarapaka in Kothagudem district was commissioned in April 2024. The approach road on the right side of the bridge caved in within two years, disrupting traffic between Sarapaka and Bhadrachalam. Repair works and investigations into the cause of the collapse have begun. The bridge was built by Rajdeep Buildcon Private Limited at an estimated cost of Rs 98.45 crore and took nearly nine years to complete, although originally scheduled for two years. It serves as an important connecting point for Telangana, Andhra Pradesh, and Chhattisgarh. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
