Second Bridge and Roadway Construction
Sector: Water Supply and Storage • Location: Lake Havasu City, Arizona, United States of America
Source: Dodge
Construction Manager at risk services for Second Bridge and Roadway construction. Project include New utility lines will be within the bridge and connected to their respective existing systems, of specific note is the water and wastewater systems. Sidewalks and bicycle lanes will be incorporated into the bridge for connectivity to the existing multi-use paths on the Island, at McCulloch, and on th
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Bridge, Road, Power Transmission, Car parking, Automotive, Commercial, Power Generation (CCGT)
- Location
- Lake Havasu City, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Second Bridge and Roadway Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction Manager at risk services for Second Bridge and Roadway construction. Project include New utility lines will be within the bridge and connected to their respective existing systems, of specific note is the water and wastewater systems. Sidewalks and bicycle lanes will be incorporated into the bridge for connectivity to the existing multi-use paths on the Island, at McCulloch, and on the mainland side to the Bridgewater Channel Pathway and the London Bridge Road Bike Lane and Pedes... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Lake Havasu City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Bridge, Road, Power Transmission, Car parking, Automotive, Commercial, Power Generation (CCGT) |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
