Second Container Terminal at Port Mohammad Qasim

Sector: Government • Location: Pakistan

Source: World Bank Group

Project
Active

On Aug. 17, 2006, Port Qasim Authority signed an agreement with UAE’s DP World for the development of a new container terminal at Port Muhammad Qasim near Karachi on a build-operate-transfer (BOT) basis with a term of 21 years. The new terminal, designed to have a handling capacity of 1.175 million TEUs, was to be developed in three phases. QICT is owned 75% by DP World Ltd. of Dubai, U.A.E., and

Project Information FAQ

Project Information

4 Q
The project “Second Container Terminal at Port Mohammad Qasim” is an infrastructure initiative in the Government sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On Aug. 17, 2006, Port Qasim Authority signed an agreement with UAE’s DP World for the development of a new container terminal at Port Muhammad Qasim near Karachi on a build-operate-transfer (BOT) basis with a term of 21 years. The new terminal, designed to have a handling capacity of 1.175 million TEUs, was to be developed in three phases. QICT is owned 75% by DP World Ltd. of Dubai, U.A.E., and 25% by International Terminal Holding Limited, an offshore entity owned and controlled by Pakistan-based entrepreneur, Mr. Habibullah Khan. This BOT terminal project, which was awarded following direct negotiations, was the result of Government of Pakistan’s economic policy to encourage private sector investment and participation in the development of the country’s port infrastructure. The total cost of the project was estimated at US$ 211 million. A US$73.5 million 8-year term loan, which was signed on May 15, 2008, and which closed on June 13, 2008, was to be used to finance 80% of the first phase of the project valued at US$94 million. Standard Chartered Bank, Dubai Islamic Bank and National Bank of Pakistan were mandated lead arrangers of the loan, repaying quarterly for 8 years. The arranging fee was at 120 bps under KIBOR (Karachi Interbank Offered Rate). Construction work on phase one, which was to have a design capacity of 300,000 TEUs per annum, was scheduled to commence on Jan. 1, 2008. As of end 2009, construction work on phase one was 44% complete, with completion scheduled for end 2011. Construction work on an additional second phase was scheduled to be complete in 2013. http://www.portqasim.org.pk/future.htm

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data