logo
ProjectPlanned

Second Data Center Project on Mount Athos Road

The owner, status and timeline of this project. A free account opens every field.

Source: WDBJ7

Two concept plans for a data center complex on a 64-acre property on Mount Athos Road in Campbell County were reviewed. The first plan includes two phases with a total of 13 to 15 data center buildings built over around 15 years, and the second plan consists of seven larger buildings. The site has 40MW of power available with potential expansion, water resources, and multiple entrances requiring n

Status
Prospective
Sector
Water Supply and Storage, Data Center, Road, Power Generation (CCGT)
Location
Rustburg, Virginia, United States of America
Updated
22 Jul 2026
Source
WDBJ7

ConstructChat

Ask ConstructChat about Second Data Center Project on Mount Athos Road

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Second Data Center Project on Mount Athos Road” is an infrastructure initiative in the Water Supply and Storage sector, located in Rustburg, Virginia, United States. Taiyo aggregates data on it from WDBJ7.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Two concept plans for a data center complex on a 64-acre property on Mount Athos Road in Campbell County were reviewed. The first plan includes two phases with a total of 13 to 15 data center buildings built over around 15 years, and the second plan consists of seven larger buildings. The site has 40MW of power available with potential expansion, water resources, and multiple entrances requiring no new roads.

Original sector

Technology

Location

Country

United States of America (USA)

State

Virginia

City

Rustburg

Source

Source

WDBJ7

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Data Center, Road, Power Generation (CCGT)

Article published date

2025-12-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project