logo
ProjectCompleted

Second Division Solar Project

The owner, status and timeline of this project. A free account opens every field.

Source: Lightsource bp

The Second Division Solar project is a 125MW solar farm located in Brazoria County, Texas. It is designed to generate affordable, clean energy and contribute to Texas's energy independence while reducing carbon emissions by 155,000 metric tons annually.

Status
Closed
Sector
Solar, Raw Materials, Commercial
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Lightsource bp

ConstructChat

Ask ConstructChat about Second Division Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Second Division Solar Project” is an infrastructure initiative in the Solar sector, located in Texas, United States. Taiyo aggregates data on it from Lightsource bp.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Second Division Solar project is a 125MW solar farm located in Brazoria County, Texas. It is designed to generate affordable, clean energy and contribute to Texas's energy independence while reducing carbon emissions by 155,000 metric tons annually.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Texas

Source

Source

Lightsource bp

URL

More Details

Record type

Project

Sector

Solar, Raw Materials, Commercial

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project