Second Dushanbe Water Supply Project
One of 2,118 projects Taiyo tracks in Tajikistan.
Source: World Bank Group
The objective of the Second Dushanbe Water Supply Project for Tajikistan is to improve water utility performance and water supply services in selected areas of Dushanbe. There are four components to the project, the first component being metering and demand management. The component will finance consumption metering and bulk metering of water, for increased revenue, reduced wastage, and better tra
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Residential, Commercial
- Location
- Tajikistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Second Dushanbe Water Supply Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Second Dushanbe Water Supply Project for Tajikistan is to improve water utility performance and water supply services in selected areas of Dushanbe. There are four components to the project, the first component being metering and demand management. The component will finance consumption metering and bulk metering of water, for increased revenue, reduced wastage, and better tracking of losses, including: i) supply and installation of 76,500 residential meters (i.e. approximately 46 percent of Dushanbe Vodokanal (DVK) users; and installation of 1,500 apartment building master meters in selected areas of the city; ii) rehabilitation of 1,500 apartment building service connections; iii) supply and installation of bulk flow meters at water production facilities; iv) supply and installation of a Network Information System (NIS); v) communication strategy and public awareness campaigns to promote metering and demand management; and vi) installation of Supervisory control and data acquisition (SCADA) system. The second component is the water quality improvement. The components will support system upgrades for improved quality of water, including network cleaning. The third component is the institutional strengthening and capacity building. The component will finance activities to build institutional capacity and improve utility performance of DVK, which includes: carrying out an assessment of DVK's organizational and capacity-building needs; and installation of modern accounting, billing and water revenue collection systems. Finally, the fourth component is the implementation support. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Tajikistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Residential, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tajikistan
- Sangtuda 2 Hydropower Plant
- PamirEnergy
- Tajikistan: Obigarm-Nurobod Road Project - Long Bridge and Approaches
- Enhancing Sustainability: Financing for the Rogun Hydropower Project
- Yavan Water
- Tajikistan: Nurek Hydropower Rehabilitation, Phase I
- Water Resources Management in Pyanj River Basin Project
- Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe–Kurgonteppa) Road Project
