logo

Second Generation Ethanol Biorefinery Project, Bathinda, Punjab

Sector: Biomass • Location: Bathinda, Punjab, India

Source: India Investment Grid (IIG)

Project
Closed

Information Ministry of Petroleum & Natural Gas has come up with Second Generation Ethanol Biorefinery Project, Bathinda, Punjab with a ticket size of 1421.46 INR Crores. This project in Refining sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project HPCL is constructing a Second Generation Technology based Et

Project Information FAQ

Project Information

5 Q
The project “Second Generation Ethanol Biorefinery Project, Bathinda, Punjab” is an infrastructure initiative in the Biomass sector, located in Bathinda, Punjab, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Ministry of Petroleum & Natural Gas has come up with Second Generation Ethanol Biorefinery Project, Bathinda, Punjab with a ticket size of 1421.46 INR Crores. This project in Refining sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project HPCL is constructing a Second Generation Technology based Ethanol bio refinery at Bathinda District , Punjab with production capacity of 100 KL per day ethanol from using lignocellulose biomass. The project will help in reducing large-scale staple burning in the state post harvesting besides converting waste into energy. The 2G plant will play a major role in making bioethanol available for blending. The key elements in the project scope are as under Facilities Biomass storage, handling, milling and wet washing section and Storage of Enzymes, yeast, chemicals, intermediate products and Ethanol Installation of Solid Liquid Separation Unit separating the lignin for usage as boiler fuel Setting up of two Nos of twin Drum Process steam boiler and 3 Cell -six compartment cooling tower Various Conveyor system for feedstock ,chemical , Boiler Fuel and Ash handling Ethanol Production section comprising of PreTreatment, Enzymatic Hydrolysis, Co-fermentation, Distillation and Dehydration units Ethanol Loading Gantry facilities Raw water storage and treatment plant including DM Plant Environmental Control Units like Reverse Osmosis Treatment Plant, Multiple Effect evaporation systems meeting zero liquid discharge norms

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data