Second Life Extension Project at Armenian Nuclear Power Plant Unit 2
Sector: Power Generation (CCGT) • Location: Metsamor, Armenia
Source: Arka.am
Rosatom has completed its annual work plan for 2025 at Unit 2 of the Armenian Nuclear Power Plant as part of the second life extension project. The work focused on enhancing safety and reliability, verifying operational capability, evaluating the lifespan of non-replaceable equipment, and preparing for new configurations of the emergency core cooling system.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Rosatom has completed its annual work plan for 2025 at Unit 2 of the Armenian Nuclear Power Plant as part of the second life extension project. The work focused on enhancing safety and reliability, verifying operational capability, evaluating the lifespan of non-replaceable equipment, and preparing for new configurations of the emergency core cooling system. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
