Second Loess Plateau Watershed Rehabilitation Project
Sector: Road • Location: China
Source: World Bank Group
The development objective of the Second Loess Plateau Watershed Rehabilitation Project is to contribute to a sustainable development in the Loess Plateau, increasing agricultural production and incomes, as well as improving the ecological conditions in tributary watersheds of the Yellow River. This is in line with the objectives of the Country Assistance Strategy (CAS), which support the assistanc
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Raw Materials, Government, Residential, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Second Loess Plateau Watershed Rehabilitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Second Loess Plateau Watershed Rehabilitation Project is to contribute to a sustainable development in the Loess Plateau, increasing agricultural production and incomes, as well as improving the ecological conditions in tributary watersheds of the Yellow River. This is in line with the objectives of the Country Assistance Strategy (CAS), which support the assistance for better utilization of marginal land through sustainable techniques, and, develop income-generation programs in poorer provinces. The main components call for, cropland improvement, which includes the conversion of slope-lands to terraced lands, where soil erosion is controlled and water retained, thus producing higher crop yields. Control dams will be constructed to retain sediments and flooding, and store water for irrigation and water supply. Irrigation will consist of small water cisterns which will catch run-offs from roads or small water surface diversions, as well as small-scale irrigation schemes, mostly in Inner Mongolia. The second component, slope-land protection, will increase the vegetation cover, improving the erosion control capacity in project watersheds, which will be enhanced by planting and protecting trees, shrubs, and grass. Besides various species of trees to be planted on narrow terraces, fruit and nut-bearing trees will also be planted, thus marketing will be improved through investments in horticulture. |
Original sector | FY17 - Agriculture, Fishing and Forestry |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Raw Materials, Government, Residential, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in China
- Beilungang CoalFired
- Wensu County Rural Roads Construction Project
- Huaxi section, part of the southern section of Huaguan Road
- Dongming County Highway
- Ji'an City urbanization project
- Wenzhou Oujiang Belt Expressway to Woqi Section and Oujiang Road East Extension
- Roadway No. 321 (Wuzhou Section)
- Shen-Shan Highway (Eastern Section)
