Second Loop Transmission Project in Sabah
Planned · Sabah · Last reported Sep 2025
Source: NST Online
The Second Loop Transmission project is an infrastructure initiative aimed at improving the electricity grid in Sabah, Malaysia. It is intended to enhance the stability and reliability of power supply, especially after a landslide-induced tower collapse caused a 15-hour power outage affecting over 230,000 people on Sabah's east coast. The project is urged to be expedited by local political leaders
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Sabah, Malaysia
- Updated
- 19 Nov 2026
- Source
- NST Online
ConstructChat
Ask ConstructChat about Second Loop Transmission Project in Sabah
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Second Loop Transmission project is an infrastructure initiative aimed at improving the electricity grid in Sabah, Malaysia. It is intended to enhance the stability and reliability of power supply, especially after a landslide-induced tower collapse caused a 15-hour power outage affecting over 230,000 people on Sabah's east coast. The project is urged to be expedited by local political leaders to address energy supply issues. |
Original sector | Energy |
Location
Country | Malaysia |
State | Sabah |
Source
Source | NST Online |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-11-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
