Second Mulilo-Sonnedix Prieska Solar PV Plant

Sector: Solar • Location: South Africa

Source: World Bank Group

Project
Active

The Second 86MW Mulilo-Sonnedix Prieska solar PV reached financial closure in February 2015, as the loan agreement was signed. This BOO project worth of US$133 million would entail the development of solar PV power plant located at 50km south west of Prieska. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE).

Project Information FAQ

Project Information

4 Q
The project “Second Mulilo-Sonnedix Prieska Solar PV Plant” is an infrastructure initiative in the Solar sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Second 86MW Mulilo-Sonnedix Prieska solar PV reached financial closure in February 2015, as the loan agreement was signed. This BOO project worth of US$133 million would entail the development of solar PV power plant located at 50km south west of Prieska. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE). The DoE selected six solar photovoltaic, seven wind, two concentrated solar power, one landfill gas and one biomass project as preferred bidders in October 2013 for the third round of its REIPPP and the sponsors for each project were scheduled to simultaneously sign power purchase agreements with state utility Eskom and reach financial close on 30 July. The financial closure was delayed mainly due to the insufficient transmission infrastructure for the generation facilities. On July 22, DoE confirmed that the 17 projects involved in the third round of REIPPP would not reach financial close on 30 July 2014, as planned. Unlike in previous rounds of the REIPPP, where the signing of project documents and financial close happened simultaneously, none of the Window 3 deals was expected to close before January 2015 at the earliest, according to sources working on the transactions. The financing comprised US$33 million equity and US$100 million debt at the debt/equity ratio of 75:25. The project company was Mulilo-Sonnedix Prieska solar PV (Pty) Ltd. and the equity sponsors were Sonnedix Solar Africa Holdings (60%, 100% owned by Sonnedix Africa B.V.), Mulilo Sonnedix Solar Enterprises (20%, 100% owned by Mulilo Group Holdings), Mulilo Prieska Solar Community Trust (5%), and Ixowave (15%). The debt funding was provided by Nedbank, lending US$65 million (R755 million) to this project, alongside Standard Bank (US$35 million), which was taking 35% of the senior debt. http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/Mulilo%20Sonnedix%20Prieska%20PV.pdf Financing info insufficient. Calculation was done through Debt funding (Nedbank)-> Debt funding (Standard Bank -> Debt equity/ratio -> Equity Funding -> Total Estimated Cost

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data