logo
ProjectProject Awarded

Second Niger Bridge PPP project

The owner, status and timeline of this project. A free account opens every field.

Source: InfraPPPWorld

The bridge, which forms part of the Arterial Route A232; Enugu-Onitsha-Asaba-Benin-Shagamu, is 1,590m in length and located 1.7km downstream of the existing bridge on a new alignment. The project will be developed on a design, build, finance, operate and transfer (DBFOT) basis for a period of 25 years.

Status
Closed
Sector
Bridge, Road
Location
Nigeria
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Second Niger Bridge PPP project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Second Niger Bridge PPP project” is an infrastructure initiative in the Bridge sector, located in Nigeria. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Company

Status

Original status

project awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The bridge, which forms part of the Arterial Route A232; Enugu-Onitsha-Asaba-Benin-Shagamu, is 1,590m in length and located 1.7km downstream of the existing bridge on a new alignment. The project will be developed on a design, build, finance, operate and transfer (DBFOT) basis for a period of 25 years.

Original sector

Transport

Procurement method

Budget

Location

Country

Nigeria

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project