ProjectClose
Second Power Development Study
Sector: Power Generation (CCGT) • Location: Tonga
Source: Asian Development Bank (ADB)
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Tonga
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Second Power Development Study
Pick a question to edit it, or write your own.
First answer free · no account
I am a
Project Information FAQ
Project Information
5 Q
Participants
Sponsoring Agency |
Status
Original status | close |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Original sector | Energy |
Budget |
Location
Country | Tonga |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-02-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Tonga
- Tonga/Meridian Popua Solar Plant
- Shoreline Power
- Power Development
- 6 Megawatt Hihifo Solar Power Project
- TEPB Institutional and Financial Development
- Grid Enhancement for Sustainable Energy Transition Project (formerly Grid Strengthening Project)
- Institutional Development of the Tonga Electric Power Board & for Rural Electrification
- Tonga Subsea Geothermal Pilot Project
