Second Power Transmission Project
One of 10,000+ projects Taiyo tracks in Pakistan.
Source: Aaj English TV
A $330 million project designed to improve the reliability of electricity transmission and enable the evacuation of up to 2,300 megawatts of hydropower in Pakistan. The project aims to reduce system constraints and enhance grid stability.
- Status
- Closed
- Sector
- Government, Hydro, Power Generation (CCGT)
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- Aaj English TV
ConstructChat
Ask ConstructChat about Second Power Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $330 million project designed to improve the reliability of electricity transmission and enable the evacuation of up to 2,300 megawatts of hydropower in Pakistan. The project aims to reduce system constraints and enhance grid stability. |
Original sector | Energy |
Budget |
Location
Country | Pakistan |
Source
Source | Aaj English TV |
URL |
More Details
Record type | Project |
Sector | Government, Hydro, Power Generation (CCGT) |
Article published date | 2025-12-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
