logo

Second Power Transmission Project

Sector: Power Transmission • Location: Ukraine

Source: World Bank Group

Project
Active

The objective of the Second Power Transmission Project in Ukraine is to improve the reliability of the power transmission system and support the implementation of the Wholesale Electricity Market in Ukraine. The project consists of the following three components and subcomponents: (1) Rehabilitation of Transmission Substations. Replacement of outdated high voltage equipment, installation of gas-in

Project Information FAQ

Project Information

5 Q
The project “Second Power Transmission Project” is an infrastructure initiative in the Power Transmission sector, located in Ukraine. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Second Power Transmission Project in Ukraine is to improve the reliability of the power transmission system and support the implementation of the Wholesale Electricity Market in Ukraine. The project consists of the following three components and subcomponents: (1) Rehabilitation of Transmission Substations. Replacement of outdated high voltage equipment, installation of gas-insulated switchgears, and replacement of auxiliary power equipment, protective layering and substation control and automation systems in selected high voltage transmission substations. (2) Electricity Market Enhancement. This component consists of four subcomponents: Subcomponent 2.1: Installation and connection of reactive power compensation devices for selected high voltage transmission substations. Subcomponent 2.2: Introduction of Smart Grid through purchase and installation of Smart Grid solutions including: (a) modernization of the telecommunications network between renewable energy sources, key substations of transmission networks and system operator control centers; and (b) modernization of the regional and national system of load distribution and organization of control centers. Subcomponent 2.3: Provision of support to the Balancing Market through purchase and installation of hardware and software for the proper functioning of the Balancing Market of electricity, ancillary services market and fulfillment of administrative settlement services, administration of commercial settlement, as well as other services of the System Operator based on the Electricity Market Law of Ukraine. Subcomponent 2.4: Support for institutional development of the Project Implementing Entity (UE) by: (a) establishing a corporate-wide management information system (MIS) in the Project Implementing Entity; (b) providing technical assistance to the Project Implementing Entity on procurement, financial management and project management; and (c) financing of 9 audits and training.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data