Second Power Transmission Strengthening Project
The owner, status and timeline of this project. A free account opens every field.
Source: Profit by Pakistan
A project aimed at strengthening the national power transmission system in Pakistan, facilitating the reliable evacuation of 2,300 megawatts of electricity from upcoming hydropower projects, reducing overloading on existing transmission lines, and enhancing the resilience of the national grid under contingency conditions.
- Status
- Closed
- Sector
- Government, Hydro, Power Generation (CCGT)
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- Profit by Pakistan
ConstructChat
Ask ConstructChat about Second Power Transmission Strengthening Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A project aimed at strengthening the national power transmission system in Pakistan, facilitating the reliable evacuation of 2,300 megawatts of electricity from upcoming hydropower projects, reducing overloading on existing transmission lines, and enhancing the resilience of the national grid under contingency conditions. |
Original sector | Energy |
Budget |
Location
Country | Pakistan |
Source
Source | Profit by Pakistan |
URL |
More Details
Record type | Project |
Sector | Government, Hydro, Power Generation (CCGT) |
Article published date | 2025-12-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
