logo

Second Renewable Energy

Sector: Water Supply and Storage • Location: India

Source: World Bank Group

Project
Closed

The Second Renewable Energy Project aims to 1) increase power supply; 2) mobilize private sector investments in renewable energy power projects; and 3) promote energy efficiency and demand-side management (DSM) investments. The project has three components. The first finances small hydro investments by the private sector in, for example, canal-based and dam toe (sic) schemes, run-of-river schemes,

Status
Closed
Sector
Water Supply and Storage, Rail, Power Transmission, Geothermal, Power Generation (CCGT), Hydro, Government, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Second Renewable Energy

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Second Renewable Energy” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Second Renewable Energy Project aims to 1) increase power supply; 2) mobilize private sector investments in renewable energy power projects; and 3) promote energy efficiency and demand-side management (DSM) investments. The project has three components. The first finances small hydro investments by the private sector in, for example, canal-based and dam toe (sic) schemes, run-of-river schemes, rehabilitation and/or upgrading of old plants, use of tail ends of cooling water systems of thermal power plants, and stand-alone micro-hydro schemes. The project designs rural energy initiatives that feature partnerships between private investors and user communities. The second component helps design, develop, and implement integrated energy management services operated by service companies and end-users on a performance guarantee basis; purchases and installs energy-efficient and/or load management devices and systems; produces energy-efficient equipment; and encourages end-user participation in the state energy board and other utility-sponsored DSM programs. The third component finances pre-investment activities that develop a sustainable pipeline of energy-efficient investments and standard bidding document preparation; establish in-house capacity within IREDA (the Indian Renewable Energy Development Agency Limited) to appraise, supervise, and promote energy efficiency services and schemes; assist in promoting end-use efficiency; and train officials and staff.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Rail, Power Transmission, Geothermal, Power Generation (CCGT), Hydro, Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project