logo
ProjectClosed

Second Rural Employment Project

Sector: Road • Location: Algeria

Source: World Bank Group

The Project seeks to generate and stimulate rural employment in poor rural mountainous areas of northwest and north-central Algeria. In the first instance, the Project aims to respond in the short-term to the critical problem of unemployment in the target rural areas through direct employment creation, using labor-intensive civil works for natural resource management emphasizing soil erosion contr

Status
Closed
Sector
Road, Water Supply and Storage, Raw Materials, Commercial, Government
Location
Algeria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Second Rural Employment Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Second Rural Employment Project” is an infrastructure initiative in the Road sector, located in Algeria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project seeks to generate and stimulate rural employment in poor rural mountainous areas of northwest and north-central Algeria. In the first instance, the Project aims to respond in the short-term to the critical problem of unemployment in the target rural areas through direct employment creation, using labor-intensive civil works for natural resource management emphasizing soil erosion control. The longer-term perspective emphasizes the instrument of asset creation for stimulating employment, mainly through natural resource management, protection of the environment, water resource mobilization, and income-generating rural development activities aiming at the substitution of perennial tree crops in place of annual cereal production, with the purpose of increasing labor productivity in a sustainable manner. There are five project components. The specific activities of Component 1, soil erosion control, comprise the following: reforestation targeting degraded mountainous areas, river bank protection entailing the biological stabilization of river banks; terracing and biological control entailing the building or the rehabilitation of terraces on steep slopes susceptible to serious erosion, plant material production, flood control structures, forest rehabilitation, and silvicultural activities, which aim at cleaning up degraded forest areas with plants that are old, dead or suffering from pests. Component 2 aims to diversify the production base by expanding the limited tree fruit production in the project area. Specific activities call for fruit tree plantations, windbreaks, vineyards, land clearing, upgrading and rehabilitating rural roads, commercial production of small livestock, and artisanal activities targeting rural women. Component 3 focuses on resource mobilization. Component 4 covers support for the Central project management unit (CCGW) and the Wilaya level PMU (CCGW), including training. Lastly, Component 5 finances institutional development for the Ministry of Agriculture and Rural Development (MADR).

Original sector

FY17 - Transportation

Budget

Location

Country

Algeria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Raw Materials, Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project