logo

Second Rural Employment Project

Sector: Road • Location: Algeria

Source: World Bank Group

Project
Closed

The Project seeks to generate and stimulate rural employment in poor rural mountainous areas of northwest and north-central Algeria. In the first instance, the Project aims to respond in the short-term to the critical problem of unemployment in the target rural areas through direct employment creation, using labor-intensive civil works for natural resource management emphasizing soil erosion contr

Project Information FAQ

Project Information

5 Q
The project “Second Rural Employment Project” is an infrastructure initiative in the Road sector, located in Algeria. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project seeks to generate and stimulate rural employment in poor rural mountainous areas of northwest and north-central Algeria. In the first instance, the Project aims to respond in the short-term to the critical problem of unemployment in the target rural areas through direct employment creation, using labor-intensive civil works for natural resource management emphasizing soil erosion control. The longer-term perspective emphasizes the instrument of asset creation for stimulating employment, mainly through natural resource management, protection of the environment, water resource mobilization, and income-generating rural development activities aiming at the substitution of perennial tree crops in place of annual cereal production, with the purpose of increasing labor productivity in a sustainable manner. There are five project components. The specific activities of Component 1, soil erosion control, comprise the following: reforestation targeting degraded mountainous areas, river bank protection entailing the biological stabilization of river banks; terracing and biological control entailing the building or the rehabilitation of terraces on steep slopes susceptible to serious erosion, plant material production, flood control structures, forest rehabilitation, and silvicultural activities, which aim at cleaning up degraded forest areas with plants that are old, dead or suffering from pests. Component 2 aims to diversify the production base by expanding the limited tree fruit production in the project area. Specific activities call for fruit tree plantations, windbreaks, vineyards, land clearing, upgrading and rehabilitating rural roads, commercial production of small livestock, and artisanal activities targeting rural women. Component 3 focuses on resource mobilization. Component 4 covers support for the Central project management unit (CCGW) and the Wilaya level PMU (CCGW), including training. Lastly, Component 5 finances institutional development for the Ministry of Agriculture and Rural Development (MADR).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data