logo

Second Rwanda Urban Development Project

Sector: Road • Location: Rwanda

Source: World Bank Group

Project
Active

The objective of the Second Urban Development Project for Rwanda is to improve access to basic services, enhance resilience and strengthen integrated urban planning and management in the City of Kigali (CoK) and the six secondary cities of Rwanda. The project has four components. (1) Support to the City of Kigali component will support the comprehensive upgrading and flood risk management of four

Project Information FAQ

Project Information

5 Q
The project “Second Rwanda Urban Development Project” is an infrastructure initiative in the Road sector, located in Rwanda. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Second Urban Development Project for Rwanda is to improve access to basic services, enhance resilience and strengthen integrated urban planning and management in the City of Kigali (CoK) and the six secondary cities of Rwanda. The project has four components. (1) Support to the City of Kigali component will support the comprehensive upgrading and flood risk management of four unplanned settlements, reduce flood risks at selected locations identified as flood hotspots in the city, pilot an integrated approach to sustainable wetland management and carry out a series of technical assistance (TA) to develop tools for evidence based, integrated urban planning and provide institutional capacity development and support to the CoK. (2) Support to Secondary Cities component will support the provision of basic infrastructure in six secondary cities in two phases, finance feasibility studies, detailed design and construction supervision activities and support the functioning of the newly established CMOs through institutional and capacity development. (3) Institutional Capacity Development and Project Management component will support institutional and capacity development at the national level, overall project coordination by Ministry of Infrastructure and project management costs across implementation agencies at the national level, CoK and secondary cities. (4) Contingency Emergency Response will allow for the rapid reallocation of project funds in the event of a natural or man-made crisis during implementation of the project to address eligible emergency needs under the conditions established in the Project Implementation Manual. This component will have no initial funding allocation but will draw resources from other expenditure categories at the time of its activation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data