Second SIEPAC Circuit
The owner, status and timeline of this project. A free account opens every field.
Source: Banco Centroamericano de Integración Económica (BCIE)
The Second Circuit of the Electrical Interconnection System for Central American Countries (SIEPAC) project aims to strengthen the Regional Electricity Market (MER) by enhancing the electrical energy transmission capacity of the SIEPAC line. It includes the construction of 301.8 km of 230 kV transmission lines and the upgrade of four strategic substations across Central America.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government
- Location
- Honduras
- Updated
- 19 Nov 2026
- Source
- Banco Centroamericano de Integración Económica (BCIE)
ConstructChat
Ask ConstructChat about Second SIEPAC Circuit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Second Circuit of the Electrical Interconnection System for Central American Countries (SIEPAC) project aims to strengthen the Regional Electricity Market (MER) by enhancing the electrical energy transmission capacity of the SIEPAC line. It includes the construction of 301.8 km of 230 kV transmission lines and the upgrade of four strategic substations across Central America. |
Original sector | Energy |
Budget |
Location
Country | Honduras |
Source
Source | Banco Centroamericano de Integración Económica (BCIE) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
