logo
ProjectClosed

Second Subic Bay Freeport Project

Closed · Philippines

Source: World Bank Group

The second Subic Bay Freeport Project aims to continue to strengthen the Subic Bay Metropolitan Authority's (SBMA's) capacity to regulate and manage the growth of the Freeport, and support further infrastructure development - including SBMA's initial venture into partnership with the private sector through a water supply joint venture. The project has four components. Institutional strengthening,

Status
Closed
Sector
Road, Water Supply and Storage, Bridge, Waste Processing and Treatment, Seaport, Power Generation (CCGT), Government, Commercial
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Second Subic Bay Freeport Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Second Subic Bay Freeport Project” is an infrastructure initiative in the Road sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The second Subic Bay Freeport Project aims to continue to strengthen the Subic Bay Metropolitan Authority's (SBMA's) capacity to regulate and manage the growth of the Freeport, and support further infrastructure development - including SBMA's initial venture into partnership with the private sector through a water supply joint venture. The project has four components. Institutional strengthening, the first component, includes: capacity building; human resources management assistance; commercialization, privatization and planning support; critical technical issues studies; technical assistance support; and ecology center support. The water supply component consists of: detailed engineering; well field development; construction of raw water transmission mains, electrical power transmission lines, a water treatment plant and booster station; groundwater monitoring network installation; reforestation; and consulting services for a hydrological study. The power distribution component includes: overhead and underground transmission circuit construction; cable installation; electrical system rehabilitation and extension; provision of facilities and equipment for integrated power distribution; installation supervision engineering services; and technical assistance, training and management services. The roads, bridges and related infrastructure component will be concerned with: road improvement; rehabilitation and retrofitting; new bridge provision; road maintenance study and management system; road alignment study; related infrastructure improvements; and consulting services.

Original sector

Energy and Extractives,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management,Transportation

Budget

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Bridge, Waste Processing and Treatment, Seaport, Power Generation (CCGT), Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project