Second Timor-Leste Branch Roads Project

Sector: Road • Location: Timor-Leste

Source: World Bank Group

The proposed PDO is to be achieved through two components: (i) Gleno–Maubisse Corridor Upgrading, and (ii) Design of Future Projects.Component 1: Gleno–Maubisse Corridor Upgrading (estimated cost US$35.2 million). This component will support investments to improve the climate resilience of identified road infrastructure on the Gleno–Maubisse corridor. The integration of climate change and safety c

Status
Prospective
Sector
Road, Government, Raw Materials
Location
Timor Leste
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Second Timor-Leste Branch Roads Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Second Timor-Leste Branch Roads Project” is an infrastructure initiative in the Road sector, located in Timor-Leste. Taiyo aggregates data on it from World Bank Group.

Participants

Not available for this record.

Status

Original status

pipeline

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The proposed PDO is to be achieved through two components: (i) Gleno–Maubisse Corridor Upgrading, and (ii) Design of Future Projects.Component 1: Gleno–Maubisse Corridor Upgrading (estimated cost US$35.2 million). This component will support investments to improve the climate resilience of identified road infrastructure on the Gleno–Maubisse corridor. The integration of climate change and safety considerations into infrastructure activities will help strengthen the resilience of assets and improve the functionality of the road network. The following activities are proposed: (a) Subcomponent 1.1: Aituto–Hatubuilico Junction road upgrading (estimated cost US$29.0 million). This subcomponent will upgrade the Aituto–Hatubuilico Junction road (12 km) of the Gleno–Maubisse corridor to national road standards (6 m carriageway, 2 m shoulders, and 1 m drainage) and will provide for maintenance of the road for three years after the defect liability period. Interventions will include (i) pavement upgrading with selective widening to bring the project road to the national road standards, (ii) culvert and drainage improvement to adapt to the forecasted increases of rainfall volumes and intensities, (iii) slope stabilization structures, including installing bioengineering measures, and (iv) road safety improvements. The feasibility study and detailed design, bidding documents, Environmental and Social Impact Assessment (ESIA), Environmental and Social Management Plan (ESMP), and Land Acquisition and Resettlement Action Plan (LARAP) for the Aituto–Hatubuilico Junction road were prepared in 2019 under the Timor-Leste Road Climate Resilience Project (TLRCRP, P125032). These environmental and social (E&S) instruments will be updated to meet the Environmental and Social Safeguards (ESSs) requirements. This subcomponent will also finance the related construction supervision consultancy for the Aituto–Hatubuilico Junction road.(b) Subcomponent 1.2: Hatubuilico Junction–Ramelau Sanctuary road upgrading (estimated cost US$6.2 million). This subcomponent will upgrade the Hatubuilico Junction–Ramelau Sanctuary road (5.4 km) of the Gleno–Maubisse corridor to municipal roads standards (5 m carriageway, 2 m shoulders, and 1 m drainage) and will provide for maintenance of the road for three years after the defect liability period. Interventions will include (i) pavement upgrading with selective widening to bring the project road to the municipal road standards, (ii) culvert and drainage improvement to adapt to the forecasted increases of rainfall volumes and intensities, (iii) slope stabilization structures, including installing bioengineering measures, and (iv) road safety improvements. The detailed design for this section is planned to be prepared using grants from the Grant Facility for Project Preparation (GFPP). This subcomponent will also finance the related construction supervision consultancy for the Hatubuilico Junction–Ramelau Sanctuary road.Component 2: Design of Future Projects (estimated cost US$2.0 million). This component will finance detailed designs and E&S instruments required for the preparation of potential future investments in the road sector.

Budget

Location

Country

Timor Leste

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Government, Raw Materials

Article published date

2026-10-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project