SECOND TURCENI POWER
Sector: Power Generation (CCGT) • Location: Romania
Source: World Bank Group
The Second Turceni Thermal Power Project will consist of a thermal power station with four 330-MW lignite-fired units delivering 7,920 GWh p.a. to the interconnected system at a plant factor of 74 percent. The project will also include about 288 km of 400-kV transmission lines connecting Turceni with the city of Cluj to the north. The project will be a second stage extension to the first four 330-
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Second Turceni Thermal Power Project will consist of a thermal power station with four 330-MW lignite-fired units delivering 7,920 GWh p.a. to the interconnected system at a plant factor of 74 percent. The project will also include about 288 km of 400-kV transmission lines connecting Turceni with the city of Cluj to the north. The project will be a second stage extension to the first four 330-MW thermal power station at Turceni, which is now under construction in southwestern Romania. The basic fuel to be used will be lignite. The project will consume about 11 million tons of lignite p.a. at full operation starting in 1984-85, and will require the opening of new mines. Lignite production from existing known deposits will be capable of supplying this estimated consumption. Thus basic fuel supply is adequate and satisfactory arrangements to open the required new open cast and underground mines have been made. In addition to lignite, the Turceni station will also burn fuel oil for start-up and stabilization of lignite burning at partial load. The Government will furnish every six months lignite production data for the previous six-month period and production estimates for the next six-month period immediately following as was agreed for the first Turceni project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
