Second UAE Oil Pipeline Bypassing Strait of Hormuz
Sector: Oil and Gas • Location: Fujairah, Abu Dhabi, United Arab Emirates
Source: The Guardian
The United Arab Emirates is constructing a new oil pipeline to bypass the strait of Hormuz, aimed at securing future crude exports against disruption. This pipeline will double the UAE's export capacity via the existing Habshan-Fujairah pipeline, which currently carries up to 1.8 million barrels a day, and is expected to be operational by 2027.
- Status
- Prospective
- Sector
- Oil and Gas
- Location
- Fujairah, Abu Dhabi, United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- The Guardian
ConstructChat
Ask ConstructChat about Second UAE Oil Pipeline Bypassing Strait of Hormuz
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The United Arab Emirates is constructing a new oil pipeline to bypass the strait of Hormuz, aimed at securing future crude exports against disruption. This pipeline will double the UAE's export capacity via the existing Habshan-Fujairah pipeline, which currently carries up to 1.8 million barrels a day, and is expected to be operational by 2027. |
Original sector | Oil and Gas |
Location
Country | United Arab Emirates (UAE) |
State | Abu Dhabi |
City | Fujairah |
Source
Source | The Guardian |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-05-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
