Second Urban Institutional & Infrastructure Development Program
One of 3,507 projects Taiyo tracks in Ethiopia.
Source: World Bank Group
The UIIDP 2 is an hybrid (PforR and IPF) operation of US$500 million that will have three windows,Window 1 - PforR of US$370 million will go to Program ULGs for provision of urban services and capacity building as per agreed investment menu. Urban services menu will include (i) Road Network, Road Furniture and Road Structure; (ii) Integrated multiple infrastructure and land services (residential,
- Status
- Failure
- Sector
- Road, Water Supply and Storage, Manufacturing (Industrial), Biomass, Hotel, Residential, Waste Processing and Treatment, Government, Commercial
- Location
- Ethiopia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Second Urban Institutional & Infrastructure Development Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | dropped |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The UIIDP 2 is an hybrid (PforR and IPF) operation of US$500 million that will have three windows,Window 1 - PforR of US$370 million will go to Program ULGs for provision of urban services and capacity building as per agreed investment menu. Urban services menu will include (i) Road Network, Road Furniture and Road Structure; (ii) Integrated multiple infrastructure and land services (residential, micro and small enterprises, industrial zones, tourism sites), (iii) Sanitation, (iv) Solid waste Management services, (v) Urban disaster risk management and initiatives to enhance resilience (Urban drainage and Flood Control systems), (vi) Built facilities (Local Economic Infrastructure), and (vii) Urban green infrastructure.Window 2 - PforR of US$ 10 million will go to conduct timely mandatory audits (financial, environmental, and social, Value for money (VfM), etc) and provide timely technical support to ULGs in their respective jurisdictions for Program implementation; Window 3 - PforR of US$10 million will go to MUI for incentivizing policy reforms to support sustainable climate smart urban development and services. Window 4 - Host and Refugee window (HRW) US$100 million. This window will support refugee host ULGs (about 13 ULGs, comprising an estimated urban population of 836,000 and 806,000 refugees in 29 refugee settlements). out of the US$100 million HRW, PforR of US$85 million will directly go to the Refugee host ULGs for investments in urban infrastructure and services to benefit both host communities and refugees. The remaining US$7m and US$8m will go as IPF to federal and regional level respectively to support the implementation of the Government’s agenda for inclusive urbanization, upgrading of refugee camps into urban settlements, and land use planning, among others.Window 5 - IPF window (US$17 million) to MUI. The IPF window will support the achievements of the DLIs under the four PforR windows discussed above. The window will finance Technical Assistance, procurement of imported equipment, and Program Management. It will insulate the MUI from forex risk and allow it to import necessary institutional strengthening equipment as well as procure international consultants for advancing urban policy frontiers and addressing new areas of focus, such as climate and disaster resilience. It will also be used to support capacity building for non-participating ULGs under UIIDP 2 and prepare them to join the Program in the future. It will support and enhance operational capacity primarily at the federal level for Program management including Annual Performance Assessment (APA), Mid Term review (MTR), Program Audit, Program communication activities, etc. This sub-component will help bring together and coordinate the respective bureaus and ministries who will be engaged in the implementation of UIIDP 2 as members of the Program Steering Committee (PSC) and Program Technical Committee responsible for policy and technical issues respectively that may affect Program implementation. |
Original sector | FY17 - Social Protection,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Ethiopia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Manufacturing (Industrial), Biomass, Hotel, Residential, Waste Processing and Treatment, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Ethiopia
- Coffee processing plant
- Tariku Getachew
- Baby Food
- EIC- Essential oil processing
- Production of Nylon Yarn
- Establishment of Ground nut oil processing unit
- Establishing a Joint Venture/Purchase of new machinery and equipment/Production, processing and preservation of meat, fish, fruit, vegetables, oils and fats/Getasew Ayalew edible oil Factory
- Poultry
