Second Vivekananda Bridge Tollway Company Limited
Sector: Road • Location: India
Source: World Bank Group
In September 2002, Second Vivekananda Bridge Tollway Company Limited (SVBTC) entered into a 30 year BOT agreement with National Highways Authority of India (NHAI) to finance, design, build, operate and maintain a 6.1 km long six laned bridge across river Hoogly on NH-2, near Kolkata in West Bengal. The scope of the project included the construction of 0.88 km long bridge and six lane approaches on
- Status
- Prospective
- Sector
- Road, Bridge, Government, Automotive, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Second Vivekananda Bridge Tollway Company Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In September 2002, Second Vivekananda Bridge Tollway Company Limited (SVBTC) entered into a 30 year BOT agreement with National Highways Authority of India (NHAI) to finance, design, build, operate and maintain a 6.1 km long six laned bridge across river Hoogly on NH-2, near Kolkata in West Bengal. The scope of the project included the construction of 0.88 km long bridge and six lane approaches on both Howrah (3.67 km) and Kolkata (1.56 km) with many ramps. Construction time of three years was included in the contract term of 30 years. This project formed the critical eastern link of NHAI’s 5,486 km Golden Quadrilateral Program that linked the four major Indian cities of New Delhi, Mumbai, Chennai and Kolkata. SVBTC was a special purpose vehicle formed by Pacific Alliance-Stradec Group Infrastructure Company (PASGIC) and India’s Larsen and Toubro Limited (L&T). PASGIC had a 67% equity interest in SVBTC and the balance was held by L&T. PASGIC in turn was a consortium that comprised of infrastructure development, investment, engineering and construction firms from the US, Philippines, Malaysia, and India. The lead investor in PASGIC was Malaysia’s IJM Corporation Berhad. The project reached financial closure in March 2004 with an estimated cost of US$ 144 million. The project cost was funded through a senior debt of US$ 89 million, NHAI grant worth US$ 27 million and US$ 28 million equity and convertible equity from the sponsors. The debt was raised by a consortium of 14 banks led State Bank of India and IL&FS Investsmart Limited on a project recourse basis. Construction on the project began in 2004 and the bridge was expected to be operational in 2007. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government, Automotive, Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited