Secondary Clarifier Improvements, Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Professional engineering services for optimization evaluations and final design documents of Secondary Clarifier Improvements, Phase 1. The project will rehabilitate and repair existing clarifiers, mixed liquor channels (North, North Clarifier and South Clarifier), and scum piping to extend the overall useful life of these high value assets. Professional engineering services for optimization evalu
- Status
- Closed
- Sector
- Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Martinez, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Secondary Clarifier Improvements, Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Professional engineering services for optimization evaluations and final design documents of Secondary Clarifier Improvements, Phase 1. The project will rehabilitate and repair existing clarifiers, mixed liquor channels (North, North Clarifier and South Clarifier), and scum piping to extend the overall useful life of these high value assets. Professional engineering services for optimization evaluations and final design documents of Secondary Clarifier Improvements, Phase 1. The project will ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Martinez |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
