logo

Secondary School in Herrischried / Spiecker Sautter Lauer Architekten

Sector: Forest Products and Packaging • Location: Ingenieurbüro Bliestle

Source: ArchDaily

Project
Closed

Seven subject rooms with adjoining rooms, three-course or group rooms, flexible learning spaces, an administration and teachers' area, and a canteen (72 seats) with a fully equipped kitchen area for serving a maximum of 300 freshly prepared meals per day were realized. The new three-story building is located on the northwest side of the existing building opposite of the main entrance. The compact

Project Information FAQ

Project Information

3 Q
The project “Secondary School in Herrischried / Spiecker Sautter Lauer Architekten” is an infrastructure initiative in the Forest Products and Packaging sector, located in Ingenieurbüro Bliestle. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Seven subject rooms with adjoining rooms, three-course or group rooms, flexible learning spaces, an administration and teachers' area, and a canteen (72 seats) with a fully equipped kitchen area for serving a maximum of 300 freshly prepared meals per day were realized. The new three-story building is located on the northwest side of the existing building opposite of the main entrance. The compact building footprint minimizes the impact on the landscape.The building has been designed as a cost-effective hybrid construction with a load-bearing concrete structure and a non-load-bearing timber framed façade. The vertical timber cladding for the façade is made of untreated regional Douglas fir wood.Only on the ground floor the existing and the new building are connected by a transparent, single-story entrance building, that also serves as a weather-protected area during school breaks. The assembly hall and the canteen on the ground floor of the new building are forming the heart of the school complex. The adjacent music hall can be used as a backstage area for events. Other classrooms are located on the first and second floors and arranged around the building center, illuminated by skylights. Flexible learning spaces are located along the south façade of the upper floors.Text description provided by the architects.The two communities Rickenbach andHerrischriedin the Black Forest region with a total of 6,600 residents, have joined forces to reorganise their school landscape. After winning the two design competitions in 2016, Spiecker Sautter Lauer Architects from Freiburg were commissioned to extend the existing school building in Rickenbach into a full-time primary school for both communities and to extend the existing school building in Herrischried into a secondary school for grades 5 to 10. The general increase in construction costs and problems with the supply of specific building products led to a longer planning and construction period. The building in Herrischried was completed in 2022.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data