Section 2 of the Hwayang-Jeokgeum road

Sector: Bridge • Location: South Korea

Source: Hyundai Engineering

Project
Closed

New road across the seaThe Hwayang-Jeokgeum road construction project was divided into four sections. As excellent design and economic feasibility were considered a key to winning the project, competition was fierce among builders to receive the order for Section 2 including bridge construction. A consortium led by Hyundai E&C was successfully awarded the deal to be in charge of Section 2 by sugge

Project Information FAQ

Project Information

5 Q
The project “Section 2 of the Hwayang-Jeokgeum road” is an infrastructure initiative in the Bridge sector, located in South Korea. Taiyo aggregates data on it from Hyundai Engineering.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

New road across the seaThe Hwayang-Jeokgeum road construction project was divided into four sections. As excellent design and economic feasibility were considered a key to winning the project, competition was fierce among builders to receive the order for Section 2 including bridge construction. A consortium led by Hyundai E&C was successfully awarded the deal to be in charge of Section 2 by suggesting the eye-catching tower design and the outstanding construction capability to minimize damage to the environment.The Section 2 of the Hwayang-Jeokgeum road construction project includes the construction of an 854-meter cable-stayed bridge and a 1.2-kilometer access road. What is notable is that the Hwayang Bridge(tentatively named the Johwa Bridge) with a central span of 500 meters between two pylons is considered Korea’s longest concrete cablestayed bridge completed.In addition, the builder applied a wide range of technologies to build 170-meter-high towers.It chose parallel wire stands(PWS), connected to the towers, to reduce wind load. The auto climbing system(ACS) was introduced to construct high pylons. The ACS enabled the automatic lifting of formworks through the use of the hydraulic system without additional dismantlement and reinstallation, contributing to increasing work efficiency and managing construction quality in an easier way.The biggest challenge to the construction work conducted high in the air and the marine construction involving the handling of heavy materials was irregular weather conditions. The construction site had to fight against frequent fog, heaving seas and strong winds. Under these circumstances, the construction site committed efforts to securing safety for its workers by monitoring wind velocity in real time.The Section 2 project was commenced in December 2011 and successfully completed in February this year. The successful construction of the new road allows residents in the neighboring island to go to the land without using a ship around the clock, and the Hwayang Bridge, which has emerged as a new landmark in the southern coast, is expected to help vitalize the local economy as a tourist attraction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data