logo

Section between Third bridge and Pingshan, part of Huai'an section, S238

Sector: Road • Location: China

Source: World Bank Group

Project
Active

S238 Huaining Section Highway Reconstruction Project Phase II The Third Bridge to Pingshan Section starts at the end of the first phase of Sanqiao Town (K17+170) via Qinghe Township, Huanglong Town and Pingshan Town, and the terminal is located in Pingshan Town (K36+690); 19.477km. The construction contents include road works, bridge and culvert works, traffic engineering, greening projects and ot

Project Information FAQ

Project Information

4 Q
The project “Section between Third bridge and Pingshan, part of Huai'an section, S238” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

S238 Huaining Section Highway Reconstruction Project Phase II The Third Bridge to Pingshan Section starts at the end of the first phase of Sanqiao Town (K17+170) via Qinghe Township, Huanglong Town and Pingshan Town, and the terminal is located in Pingshan Town (K36+690); 19.477km. The construction contents include road works, bridge and culvert works, traffic engineering, greening projects and other ancillary works within the scope of the project. The road grade is a two-way four-lane first-class highway with a design speed of 80 km/h and a subgrade width of 24.5 m. Huaining County Traffic Construction Development Co., Ltd. is the government company responsible for the project. Total project cost is $ 108.75 million. The BOT concession has a duration of 18 years. Financial close took place on November 2, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=c5fad13c95f94ab49c49c7054002cddb

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data