logo

Section Tianjin West of Tianjin Jinshi Expressway

One of 10,000+ projects Taiyo tracks in China.

Source: World Bank Group

Project
Active

The project entails the construction of a Jinshi Expressway numbered G0211. The total length of the Tianjin West Section of the Jinshi Expressway is about 12.5 kilometers, and the total static investment is about $ 464.25 million. The project is located in Jinghai District, Tianjin, and the project area is Jiakouyu Flood Diversion Area. The project starts from the Beijing-Shanghai Expressway Huxin

Status
Prospective
Sector
Commercial, Road, Bridge, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Section Tianjin West of Tianjin Jinshi Expressway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Section Tianjin West of Tianjin Jinshi Expressway” is an infrastructure initiative in the Commercial sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of a Jinshi Expressway numbered G0211. The total length of the Tianjin West Section of the Jinshi Expressway is about 12.5 kilometers, and the total static investment is about $ 464.25 million. The project is located in Jinghai District, Tianjin, and the project area is Jiakouyu Flood Diversion Area. The project starts from the Beijing-Shanghai Expressway Huxinzhuang Interchange, and connects with the current Jinshi Expressway. It passes through Jinghai District Wangjing Village, Dahuangyu Village, Langqi Village, etc., and ends in Tianjin and Hebei Province, in Dongxinzhuang. It is connected to the Hebei section of the Jinshi Expressway in the north. There are 3 bridges in the whole line; 2 interchanges are set up in the whole line, including 1 interchange and 1 single interchange. There are 1 separate interchanges on the whole line, all of which are mainly on the line. There are 6 channels on the whole line; The length of the bridge is 4533 meters, accounting for 36.6% of the total length of the route; the length of the main line is 7897 meters, accounting for 63.4% of the total; one main toll station, one toll station; and 19 culverts, with an average of 1.53 per kilometer. Sponsors of the project are China Communications One Public Bureau Group Co., Ltd. (95%) and the state-owned Tianjin Expressway Group Co., Ltd. (5%). The type of concession is BOT and the period of the contract is 28 years. Financial close took place on May 10, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=5c8bf49c2dee4dffb603d0f567b59e7c

Original sector

Transport

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Road, Bridge, Government

Article published date

2024-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project