logo

Section Tianjin West of Tianjin Jinshi Expressway

Sector: Road • Location: China

Source: World Bank Group

Project
Active

The project entails the construction of a Jinshi Expressway numbered G0211. The total length of the Tianjin West Section of the Jinshi Expressway is about 12.5 kilometers, and the total static investment is about $ 464.25 million. The project is located in Jinghai District, Tianjin, and the project area is Jiakouyu Flood Diversion Area. The project starts from the Beijing-Shanghai Expressway Huxin

Project Information FAQ

Project Information

4 Q
The project “Section Tianjin West of Tianjin Jinshi Expressway” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the construction of a Jinshi Expressway numbered G0211. The total length of the Tianjin West Section of the Jinshi Expressway is about 12.5 kilometers, and the total static investment is about $ 464.25 million. The project is located in Jinghai District, Tianjin, and the project area is Jiakouyu Flood Diversion Area. The project starts from the Beijing-Shanghai Expressway Huxinzhuang Interchange, and connects with the current Jinshi Expressway. It passes through Jinghai District Wangjing Village, Dahuangyu Village, Langqi Village, etc., and ends in Tianjin and Hebei Province, in Dongxinzhuang. It is connected to the Hebei section of the Jinshi Expressway in the north. There are 3 bridges in the whole line; 2 interchanges are set up in the whole line, including 1 interchange and 1 single interchange. There are 1 separate interchanges on the whole line, all of which are mainly on the line. There are 6 channels on the whole line; The length of the bridge is 4533 meters, accounting for 36.6% of the total length of the route; the length of the main line is 7897 meters, accounting for 63.4% of the total; one main toll station, one toll station; and 19 culverts, with an average of 1.53 per kilometer. Sponsors of the project are China Communications One Public Bureau Group Co., Ltd. (95%) and the state-owned Tianjin Expressway Group Co., Ltd. (5%). The type of concession is BOT and the period of the contract is 28 years. Financial close took place on May 10, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=5c8bf49c2dee4dffb603d0f567b59e7c

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data